Bron Converting Case Study: Prototype Scaling with VHB

If your team is looking for a custom solution to increase efficiency and reduce labor costs, reach out to the team at Bron Converting for a process review!

Written by
Bron Marketing
Published on
July 23, 2024 at 10:35:49 AM PDT July 23, 2024 at 10:35:49 AM PDTrd, July 23, 2024 at 10:35:49 AM PDT

Problem: Scaling from prototype to full production

Solution: Bron Converting

Results: Efficiency increase, reduced labor costs


A customer in Arizona met with an Application Specialist to scale their newest design, with the goal of increasing their production efficiency and reducing labor costs.


Backstory

They have been working for over a year on a prototype to get the approvals and certifications needed for this design. After obtaining all necessary paperwork and approvals, it was time to scale up the project.


A simple, yet very time-consuming, tape became a sticking point for them. During their prototype phase, the customer had an employee hand cut the tape from a larger roll and hand place a liner on the back side for them to use in their kit.


This resulted in a lot of labor hours spent cutting the strips and placing a liner. The customer eventually ended up online looking for a precut piece and found something close that was WAY out of their target cost. Both factors meant the current process was not sustainable for scaling...

 

Intro: Bron Converting

After reaching out to Bron Tapes for help, our Application Specialist was able to work with them, along with the Bron Converting team, to create a custom tape solution that meets their needs in design and is in their target cost.

If your team is looking for a custom solution to increase efficiency and reduce labor costs, reach out to the team at Bron Converting for a process review!